2020 Maintenance Projects

 - Pavement Markings

Pavement markings are used on paved roadways to provide guidance and information to driver's and pedestrians.

Pavement Markings Date Bar

- Pavement Patching

Pavement patching is an asphalt repair that is limited to the top 1 -2" of the existing surface layer.

Pavement Patching Date Bar
- Crack Sealing

Crack sealing is a method in which hot sealant is applied to cracks in the road. The main purpose of crack sealing is to prevent moisture from entering the cracks in the road. 
Crack Sealing Date Bar
- Sidewalk Improvements

Sections of sidewalk are replaced in certain areas of the Village. Areas are determined based on the amount of debilitation in the given area as well as budget allowances. 
Sidewalk Dates Bar
- Drainage Improvements

Several storm water and storm sewer drainage issues have been located within the Village. The department plans to address these issues with a drainage improvement project on a yearly basis, as funding allows. 
Drainage Dates Bar
- Sewer Televising

Sewer Televising is a video inspection which is used to inspect the interior of the sanitary sewer pipe to determine the condition of the pipe including but not limited to cracks, clogs and/or other issues. Sewer Televising will provide an accurate location of the issue so the proper solution can occur. 
Sewer TV Date Bar
- Sewer Lining

The sewer liner offers no-dig technology which allows a liner to create a new pipe within the old pipe which allows for the rehabilitation of broken, cracked, leaking or failed pipes making this method highly effective. 
Sewer Lining Date Bar
- Manhole Rehabilitation

Structural rehabilitation and protective coatings offer a cost effective permanent seal against corrosion, infiltration and exfiltration. Manhole rehabilitation also takes less time then to replace the structures.
Manhole Rehab Date Bar
- Chatham Lift Station

The Chatham Lift Station design includes a complete topographic survey of the site and adjacent areas impacting design. Design elements for the project to include select demolition of the existing facilities , duplex submersible pump station system, station valve vault including valves and metering, site force main and bypass valve-work., site work, flow control, civil works, enclosures, controls cabinetry, and other contributory civil, mechanical and electrical components supportive of the major items of work. 
Chatham Lift Station Date Bar